New doors to be completed by end May 2024 / by Nisa Zakuan

With the installation of the new timber floor, there will also be the addition of 2 new doors.

 A new door will be installed in the existing opening between the foyer/lounge (aka Stables) and the main theatre (aka Chambers) significantly reducing, if not eliminating noise bleed between the 2 spaces.

 The other door will be and emergency egress in the southeast corner that exits out into the rear courtyard between the Queens and Uno Apartments. This is a great addition as often in theatre mode, dressing rooms are allocated in this corner, leading cast/crew directly out to the enclosed courtyard next to the breakaway/ops room and cast/crew toilets.